About Dholera SIR
A planned industrial city taking shape on the ground.
Dholera Special Investment Region brings industry, trunk infrastructure, utilities and long-term urban planning together across a 920 sq km region in Gujarat.
Explore Dholera infrastructure
Look beyond the map. See what is taking shape.
Dholera is a planned region where infrastructure, industry and connectivity are being developed together. Understanding what exists, what is under development and what remains planned is essential before making a property decision.
The 22.54 sq km Activation Area is the first developed phase, supported by trunk infrastructure designed for industrial and urban growth.
Infrastructure on the ground
Review roads, utilities, administration, water, wastewater, power and ICT systems separately.
Industry and long-term context
Understand how manufacturing, utilities and transport links can shape demand around a location.
Verify status before deciding
Completed regional infrastructure does not automatically mean every plot connection or planned facility is operational.
Understand the systems shaping Dholera.
Dholera's city model connects roads, underground utilities, water, wastewater, power, ICT and administration instead of treating them as isolated projects.
Every subject below has its own page with context, available imagery, status notes and source references.
Read the official NICDC project profileStatus matters: check the status note and official references on each page before relying on availability, completion or operational timelines.
Core infrastructure
Infrastructure
Administration & city governance
ABCD Building
Dholera’s administrative and command-centre complex, bringing city management, investor orientation, and digital governance functions together.
View full details
Infrastructure
Mobility & serviced land
Road Network & Utility Corridors
A planned road hierarchy with underground utility corridors designed to provide accessible, serviced plots across the Activation Area.
View full details
Infrastructure
Water management & public realm
Canal Front Development
A visible part of Dholera’s wider stormwater and flood-management strategy, combined with landscaped public-realm development.
View full details
Infrastructure
Digital city operations
Integrated Command & Control Centre
The operational intelligence layer that connects city data, digital governance, utility monitoring, and coordinated decision-making.
View full details
Infrastructure
Reliable industrial utilities
Power Infrastructure
High-capacity transmission, substations, underground distribution, smart metering, and control systems supporting industrial and urban demand.
View full details
Infrastructure
Potable & process-water systems
Water Treatment & Supply
Treatment, storage, pumping, transmission, and smart distribution systems designed for city and industrial water demand.
View full details
Infrastructure
Circular water management
Sewage Treatment & Reuse
A wastewater-collection and treatment system designed to recover water for suitable industrial and non-potable uses.
View full details
Infrastructure
Industrial wastewater management
Common Effluent Treatment
A shared treatment system intended to manage industrial effluent and return treated water to suitable non-potable uses.
View full detailsTata Electronics’ semiconductor fabrication project and the supplier, skills, utility, and logistics ecosystem forming around it.
View full detailsPlanned amenities
Planned amenity
Planned healthcare infrastructure
Multi-speciality Hospital
A planned 200-bed healthcare facility intended to support residents, workers, visitors, and Dholera’s expanding industrial community.
View full details
Planned amenity
Planned education infrastructure
Integrated School
A planned school facility supporting family life, workforce retention, and long-term community development in Dholera.
View full details
Planned amenity
Planned emergency infrastructure
Fire Station
A planned emergency-response facility supporting industrial safety, urban resilience, and coordinated incident response.
View full details